|
Progress and Status |
Top Previous Next |
|
The progress page is divided into 3 logical sections: The Jobs List, the Video Preview and the Conversion Status.
The Jobs List
The job list, which is on the left, list all the enabled jobs for conversion. Each entry has a status and a summary. The summary includes information about the job, while the status is represented by an icon: A hollow circle indicates a job is still waiting processing. A circle with an arrow, indicates that the job is currently being processed. A circle with a green 'right' mark indicates a job has finished successfully. While a circle with a red cross indicates that a job has finished with errors or failed.
Video Preview
The video preview, which is on the right, works much like the preview tab, here some snapshots of the job being converted are shown at a very slow rate. This is to give the user some graphical feedback as to where the conversion has reached, without slowing the conversion down.
Conversion Status
The conversion status, which is at the bottom of the Progress page, shows the overall progress percentage of all jobs, as well as the estimated time left to finish all jobs. Also, the current job's details, including the actual filename (which in case of enabling splitting is changed with each part) and the current output file size, are shown.
|