Progress and Status

Top  Previous  Next

The progress page is divided into 3 logical sections: The Jobs List, the Video Preview and the Conversion Status.

 

progress

 

The Jobs List

 

The job list, which is on the left, list all the enabled jobs for conversion. Each entry has a status and a summary. The summary includes information about the job, while the status is represented by an icon.

 

Video Preview

 

The video preview, which is on the right, works much like the preview tab, here some snapshots of the job being converted are shown at a very slow rate. The video is updated about once every 2 video seconds. This is to give the user some graphical feedback as to where the conversion has reached, without slowing the conversion down. The preview also shows the video time, which is updated frequently.

 

Conversion Status

 

The conversion status, which is at the bottom of the Progress page, shows the overall progress percentage of all jobs, as well as the estimated time left to finish all jobs. Also, the current job's details, including the actual filename (which in case of enabling splitting is changed with each part) and the current output file size, are shown.